Pile Driving Management System

Pile Watch (Non-Prism Version)

QS-230025-A

Pile Driving Management System-Pile Watch (Non-Prism Version)

This system utilizes the non-prism function of a total station to calculate the pile center position by measuring four points on the pile's outer diameter. It manages both the pile head eccentricity and the pile base eccentricity. Differences between the design and measured values can be displayed visually and numerically on the monitor.

Overview Diagram

  • Cast-in-Place Pile Method

    Cast-in-Place Pile Method

  • Precast Pile Method

    Precast Pile Method

Management Software

Management Software

Construction Photography

Construction Photography

Search Automatic Measurement Systems by Application

List of Automatic Measurement Systems